A concept to put a four-story, 20-unit building on a long-vacant West Main Street lot abutting the Rahway River isn’t likely to return until developers resolve flood plain issues.
Continue reading West Main Street concept ‘working out issues’
A concept to put a four-story, 20-unit building on a long-vacant West Main Street lot abutting the Rahway River isn’t likely to return until developers resolve flood plain issues.
Continue reading West Main Street concept ‘working out issues’
A developer that has proposed 300 units directly across the Rahway River from downtown has restarted the process to acquire properties necessary for the project.
Two cannabis cultivation and/or manufacturing sites could be coming to the city, including one aiming to locate at the former Galaxy Diner.
The first phase of Meridia Brownstones at Elizabeth and West Grand avenues is complete, with some issues to be resolved before the remaining 40% of Temporary Certificates of Occupancy (TCO) are granted.
Continue reading First phase of Meridia Brownstones completed
The 108-unit second phase of a two-building development downtown has begun construction with a completion timeline of 2023.
Continue reading Phase two of The Mint under way, targets 2023
The draft of a strategic plan to establish an overall vision for downtown that had been anticipated to be made public soon has been pushed back by at least a month or so.
City Council is poised to set annual water rates for the next 10 years that would include annual increases of 5%.
RSI Bank, which has operated in Rahway since 1851, has been acquired by Columbia Bank.